Mister Max | profile | all galleries >> The Cynwyd Train Station and the Cynwyd Trail are on Track >> Cynwyd Train Station Revitalization >> May 2008 - First Floor Removed tree view | thumbnails | slideshow

May 2008 - First Floor Removed

Now we can see up from the basement and down from the little bit of the first floor remaining.
previous pagepages 1 2 3 ALL next page
Temporary main entrance to the basement _8283
Temporary main entrance to the basement _8283
Original Concrete Stairs_8278
Original Concrete Stairs_8278
Rusty plate under doorway_8290
Rusty plate under doorway_8290
existing gas meter_8316
existing gas meter_8316
termite damage_8320
termite damage_8320
Brick wall over wood beam over stone foundation_8308
Brick wall over wood beam over stone foundation_8308
Ceramic Insulator_8280
Ceramic Insulator_8280
Graded rocks to reuse_8294
Graded rocks to reuse_8294
Crawlspace under the original waiting room, on the bridge side
Crawlspace under the original waiting room, on the bridge side
Re-supported beams with old wire and insulators_8279
Re-supported beams with old wire and insulators_8279
first floor and basement walls with juncture repaired
first floor and basement walls with juncture repaired
temporary support and brick above stone_8295
temporary support and brick above stone_8295
temporary supports_8304
temporary supports_8304