 The old house |
 The old barn and stable |
 Which one should be teared down |
 Most probably the old barn and stable |
 The barn is down and the burning of the wood has started |
 Day 2 |
 Day 3 |
 After three days 1/3 is still left |
 The creation of the base has started |
 Work continues |
 The first step of the foundation is laid |
 Our own waste water treatment plant |
 The stones for next layers has been delivered |
 First layer laid and ground insulation delivered |
 Foundation ready to receive the house |
 Foundation waiting |
 The prefabricated wall elements arrive |
 First element lifted |
 Element Number 1 on it's way |
 Number 1 in place |
 Number 2 in place |
 Number 2 secured |
 The western side is on it's way |
 The western side is on it's way II |
 The western side is on it's way III |
 Nearly in place |
 Now it's turn for the eastern side |
 Down it goes |
 Half a meter left |
 Fitting gable and front |
 What's wrong ? |
 Second element of the north front |
 Coming in place |
 Fits nicely |
 The last wall part I |
 The last wall part II |
 The last wall part III |
 The walls are complete |
 Our lead builder makes an inspection |
 Now it's time for the point of the gable I |
 Now it's time for the point of the gable II |
 In place |
 A small adjustment is necessary |
 Now it fits |
 The trusses is lifted in place |
 Two types of trusses |
 Placed on the walls |
 Needs to be fixed |
 Temporary rafters added |
 The rest of the trusses lifted in place I |
 The rest of the trusses lifted in place II |
 The last element is lifted |
 The eastern gable in place |
 After day 1 |
 Day 2, adding rafters to the roof. |
 North side nearly ready I |
 North side nearly ready II |
 View from West |
 View from Southeast |
 View from Southeast II |
 Windows in place I |
 Windows in place II |
 Windows from the south |
 A preview through the kitchen window |
 The old and the new house |
 The roof is covered I |
 The roof is covered II |
 The roof is covered III |
 The small window is still missing |
 Spring view I |
 Spring view II |
 Spring view III |
 The electrician has started |
 Pipes for the ventilation in place I |
 Pipes for the ventilation in place II |
 The first bedroom is ready I |
 The first bedroom is ready II |
 The first bedroom is ready III |
 At last the small window delivered I |
 At last the small window delivered II |
 At last the small window delivered III |
 From the backside |
 View from Soutwest |
 Setting sun reflections in the windows I |
 Setting sun reflections in the windows II |
 Wodden panel in place in the main area |
 Chimey and windoe ledges missing |
 Tiles in sauna in place |
 Part of the woodden panel added |
 Shower corner |
 Shower corner moisture protected |
 Wall in bathroom covered with cembrite |
 Window ledges added I |
 Window ledges added II |
 Window ledges added III |
 Night view |
 Kitchen I |
 Kitchen II |
 Kitchen III |