idle_hands
|
all galleries
>>
Galleries
>>
blowing_smoke
>
previous
|
next
20-NOV-2005
tufts cove
NSP has used very little of the gas at the Tufts Cove power plant,
instead selling it in the United States, where it fetched a high price.
In 2001, NSP says, gas sales brought in $31 million.
Consequently, it claims power rates weren’t increased
because cheaper fuel — bunker C oil was used.
Mirage Of Power Privatisation: Experience indicates that the process has only led to soaring tariffs and customer rip-offs
Nikon D100
1/640s f/6.3 at 120.0mm
full exif
other sizes:
small
medium
original
auto
previous
|
next
share
PBase Server Error
ERROR: 500
NOTES: [hset] LOADING Redis is loading the dataset in memory, at /usr/local/share/perl5/Redis.pm line 268. ,
PBASE_ENV: production
Try Again:
Go Home
ERROR: 500
NOTES: [hset] LOADING Redis is loading the dataset in memory, at /usr/local/share/perl5/Redis.pm line 268. ,
PBASE_ENV: production
Try Again:Go Home