Construction/demolition/reconstruction began today with the moving some of the stuff from the main room that was used as the main camera room, into the front entry and most of the stuff going into what will be a smaller camera room (2)-great for natural light, infants, intimates etc. 100 year old lath and horsehair plaster ceilings will be covered with 3/8" sheetrock, and might provide an inch of insulation, which would be the only insulation in the house....
LOTS more, but between trying to keep the dog from walking thru plaster and trying to get a stable connection on the internet, I'm done for the night!
More later.