Day 8 - It was a busy day here. All of the flooring on the second floor was finished. It is very nice. They also installed some lights in the attic. That is a very good thing. The major thing was getting the dry wall installed, taped and floated. By late in the day all of that was complete. Tomorrow is a drying day. All the float needs a day to dry before the painting starts on Friday. After that there are doors to install and electrical stuff to be finished. We are close to the end with the garage. For Ginny and I the next big step is moving all the garage stuff out of the container and back into the garage. After that we need to move lots of stuff in the house so that the Kitchen, dining room and bathroom project can get going. I think that it may be a week or so before that starts.