The first picture I took of the construction site this trip. The first trip's work was just laying the floor; the second trip put up the exterior walls and roof. This trip would add insulation and inside walls, add electricity and plumbing, creating a kitchen and bathroom and painting the exterior. I left to head back to the US on Saturday morning and so don't have any completed photos of work done but they managed to get the above done with the exception of 1 bedroom and the 2 closet's walls finished.