photo sharing and upload picture albums photo forums search pictures popular photos photography help login
MeetChinaBiz.org | all galleries >> All Programs >> 10th Matchmaking Trade Mission to China, Fall 2006 (10MTM06f) > With 2/3 of the bridge (20+ km) already completed...
previous | next

With 2/3 of the bridge (20+ km) already completed...

it takes hours for the 640-wheeler to make a roundtrip on the bridge, while traveling at perhaps below 10 mph. The construction team on this end of the bridge can now only make two round-trips on the bridge per day to deliver those cement blocks.


other sizes: small medium large original auto
share
PBase Server Error
photo sharing and upload picture albums photo forums search pictures popular photos photography help login

ERROR: 500

NOTES: [hset] LOADING Redis is loading the dataset in memory, at /usr/local/share/perl5/Redis.pm line 268. ,

PBASE_ENV: production

Try Again:
Go Home