photo sharing and upload picture albums photo forums search pictures popular photos photography help login
Andrew McGrail | all galleries >> Richard Schurmann's House Project *Picture Galleries* >> Filling in the Gaps > One Eaves Tray in place
previous | next
Kevin ("Metho") Mathisen

One Eaves Tray in place

Photo taken on or about Wednesday 29th of September 2004. Sufficient cathedral ceiling lining boards have been placed to attach the UpHill side Eaves trays. There are three trays, which between them make up the eaves along one wall. The trays are attached by screws which pass down through the steel angle and into the rafters.


The trays were designed for lowering into place by people standing on a scaffold inside the building. As the scaffold was outside the building anyway, we did it from there. Photo by Kevin ("Metho") Mathisen.


other sizes: small medium original auto
previous | next
comment | share
talmagedangerfield24-Jul-2014 17:25
It really looks like that roof is coming along quite nicely. I can't believe that guy is just walking across that bridge without any railing or anything. I hope that it doesn't collapse.http://www.hillsroofinginc.com