This sequence of images really needs to be viewed at Original Size in order for the explanation to make sense.
You may have to scroll back and forth between this explanation and the image being referred to.

I noticed some sounds from the street that weren't ordinary traffic. There was a crew of three and some
heavy-duty equipment working on a telephone pole (left) that had been sitting unused next to its replacement (right) for several years.

By the time I arrived the boom of the truck--operated by the worker on the left using levers--
was pushing and pulling the left pole sideways (panel A).

In Panel B note the cable collar (whose height was adjusted by the right-most worker, using a long red pole)
which permitted the boom operator to gradually raise the pole as he rocked it. Also in Panel B note the
pole-to-pole line near the top of the lopped-off pole being rocked, and the thicker pole-to-pole cable lower down; both of these
are only a (newer) pole-thickness apart from the pole being rocked. In addition, there is a line coming across the street to our house.
The point of this tedious exposition is this: that boom operator must have had a good deal of practice and a very light touch
to be able to ever-so-carefully manipulate that big heavy boom so precisely without running into those wires.

In Panel C, where the pole is actually free of the hole, notice the arm supporting the street light in addition to the wires.

Panel D illustrates how the careful placement of the lifting collar permits two workers to guide the pole
into position over the trailer bed. This time the whole team must attend to the wire crossing the street.

Once again, the careful placement of the lifting collar comes into play (Panel E), allowing two men
to maneuver the pole into its resting place on the trailer.

Finally the boom is lowered (Panel F) and the crew moves up the street to the
next set of poles. Total time elapsed: about 15 minutes.

See more people in a variety of activities at http//www.pbase.com/m4/peopledoing.
See more heavy equipment at http//www.pbase.com/m4/industrial.


other sizes: small medium large original auto
previous | next
Julie Oldfield15-Nov-2026 23:18
It looks dangerous and difficult. It’s amazing how they work with those wires. Well documented. V
Allan Jay15-Nov-2026 19:23
Great find! VVB
Commenting on this page requires a PBase account.
Please login or register.