photo sharing and upload picture albums photo forums search pictures popular photos photography help login
Ryan Harris | all galleries >> Railroad >> Locomotive Models >> Diesel Details > Phase 3 Modifications
previous | next
02-Oct-2022

Phase 3 Modifications

Two-latch door cut from extra sill to replace one-latch door and bolted panel. Stepwells still need to be cut and moved in toward the fuel tank six inches at each end.

A new high short hood will be printed to replace the original Atlas hood. The printed short hood posed on the model here represents the B30-7A1 variation with the numberboards flipped. This one doesn't fit the model because it was drawn incorrectly and is too short in length.

samsung SM-A716U
1/30s f/1.8 at 5.2mm iso320 full exif

other sizes: small medium large original auto
comment | share