photo sharing and upload picture albums photo forums search pictures popular photos photography help login
Ryan Harris | all galleries >> Railroad >> Locomotive Models >> Diesel Details > Phase 3 Modifications
previous | next
02-Oct-2022

Phase 3 Modifications

After transplanting some details from the original sill, this Phase 2 sill has also been modified to have a two-latch door in place of the one-latch door and bolted panel near the step end of the cab subbase. I have yet to cut the sill down six inches at each end to fit the shorter Phase 3 frame.

samsung SM-A716U
1/24s f/1.8 at 5.2mm iso500 full exif

other sizes: small medium large original auto
comment | share