photo sharing and upload picture albums photo forums search pictures popular photos photography help login
Kuriacose Joseph | all galleries >> Other Pictures from 2022 >> The Water Main Break - January 2022 > Water main break - 10
previous | next
21-Jan-2022

Water main break - 10

Digging up the hole after water has been pumped out.

Eventually, a ladder was placed in the hole and somebody went down the hole to fix the break.

Olympus OM-D E-M5 Mark II
1/80s f/5.6 at 26.0mm iso100 hide exif
Full EXIF Info
Date/Time21-Jan-2022 13:25:01
MakeOlympus
ModelE-M5MarkII
Flash UsedNo
Focal Length26 mm
Exposure Time1/80 sec
Aperturef/5.6
ISO Equivalent100
Exposure Bias0.00
White Balance0
Metering Modematrix (5)
JPEG Qualityfine (4)
Exposure Programprogram (2)
Focus Distance

other sizes: small medium original auto
comment | share