The morning crew eases loads across the East Fork Bridge and down towards Beaver Cove. Normally powered by two of the modified SW1200s, the 304 suffered a blown air compressor and was set off at the shops at Nimkish for repair. The afternoon job was able to lift the repaired unit later in the day.