![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Bottom Bracket lug core from below prior to fairing. Marks indicate landing pad fairing zone (1cm deep circular & flush to each stay). A mark is also indicating approximate centerline of bottom bracket.
I used a high quality G-Flex epoxy (4-7 hrs set time) thickened with a high density adhesive filler...although kit comes with 5-minute JB Kwik for this work. In hindsight I would go with a faster curing epoxy next time...as I basically lost most of a day waiting for it to set. None of these bonds (except seat post sleeve) are structural at this point...all strength comes from glass & carbon work later.
Full EXIF Info | |
Date/Time | 19-Jan-2013 10:38:45 |
Make | Olympus |
Model | E-M5 |
Flash Used | No |
Focal Length | |
Exposure Time | 1/59 sec |
Aperture | |
ISO Equivalent | 800 |
Exposure Bias | -0.50 |
White Balance | |
Metering Mode | |
JPEG Quality | |
Exposure Program | |
Focus Distance |
Copyright Tornado