photo sharing and upload picture albums photo forums search pictures popular photos photography help login
Mike Rose | all galleries >> Galleries >> Mike's HO Scale Layout (Under Construction) > New arrangement with "buildings"
previous | next
25-JAN-2011

New arrangement with "buildings"

It was Train Night, Dave came over and we promptly started changing things. Before he got there I had started putting A-Line and other boxes in and around the tracks to start to get a feel for the relationships. Note that in this new alignment, the crossing is back to a single, albeit curved, and that the track lahyout is simpler. The stand-alone structure in the front will probably connect to the building, it's the "stock prep" track. The "tank farm" is to the right.

Canon EOS 350D
2s f/22.0 at 28.0mm iso100 hide exif
Full EXIF Info
Date/Time25-Jan-2011 12:40:15
MakeCanon
ModelCanon EOS DIGITAL REBEL XT
Flash UsedNo
Focal Length28 mm
Exposure Time2.00 sec
Aperturef/22
ISO Equivalent100
Exposure Bias
White Balance
Metering Modematrix (5)
JPEG Quality
Exposure Programaperture priority (3)
Focus Distance

other sizes: small medium large original auto
share
Type your message and click Add Comment
It is best to login or register first but you may post as a guest.
Enter an optional name and contact email address. Name
Name Email
help private comment