Ovision worm installed. 46 min. while guiding and imaging M33. RMS PE reduced from 0.51 to 0.35 arc-seconds. PHD_log_05Oct08-m33-guiding.jpg
All images copyright William J. Shaheen, unless otherwise noted. Do not use or distribute without prior consent.