photo sharing and upload picture albums photo forums search pictures popular photos photography help login
Dave Hein | all galleries >> photo today >> pt 2013 > groovy baby
previous | next
23-APR-2013 © DK Hein 2013

groovy baby

Step 1: Tear out and repave an 8 ft wide strip the full length of runway (10,330 ft).
Step 2: Put temporary centerline paint on it... no reflective beads yet.
Step 3: Let it cure for 30 days so the cuts are neat and clean.
Step 4: Re-saw the 1/4-in deep grooves. And do it 1 ft at a time.

Yup, that's 10,600 passes with the machine you see above.
Final painting and application of reflective beads to follow.

I'll be sleeping during the daytime a while longer yet.

Nikon D3 ,Nikkor 20mm f/3.5 Ai-S
1/45s f/5.6 at 20.0mm iso800 full exif

other sizes: small medium large original auto
comment | share
Martin Lamoon22-May-2013 04:41
Amazing!
They have a job for life..
V
Dave Hein25-Apr-2013 12:53
Close guess. The grooves are 1.5 inches apart on center.
Ed Preston24-Apr-2013 13:47
Are the grooves about 2" apart? So the machine will make multiple cuts in one pass. Cool! Keep the coverage coming, it's interesting!