photo sharing and upload picture albums photo forums search pictures popular photos photography help login
Greg Burke | all galleries >> Galleries >> building_and_living_in_our_strawbale_house > ready for the big pour
previous | next

ready for the big pour

It took a ton of work to get to this point. radiant floor tubing visible on top of 2' grid of re-bar on top of 2" of rigid foam board insulation on top of all the plumbing and some electrical, on top of 4 " of graded sand and some additional footings, surrounded by concrete stemwall insulated with 3" foam board..


other sizes: small medium large original auto
comment | share