photo sharing and upload picture albums photo forums search pictures popular photos photography help login
Carl and Racine Erland | all galleries >> Galleries >> Saltwater Gallery > Rough Water
previous | next
17-JAN-2011 Carl Erland

Rough Water

Ogden Point Breakwater, Victoria, BC

The vision of Victoria as a major industrial centre and cargo terminal began early in the 20th century, as the city anticipated a massive increase in sea trade from deep-sea vessels using the Panama Canal, which was then under construction.

Preparations for the expected increase in shipping included building a 2,500-foot granite and concrete breakwater, which was completed in 1916. Work on The Ogden Point Breakwater included over one million tons of rock and ten thousand granite blocks. Two piers and a cargo warehouse were completed in 1918. Construction included fifty three concrete caissons and over one million cubic yards of dredged fill. Total cost of the project was $5 million.

The 800-metre long Breakwater safeguards the Port of Victoria and is currently operated by the Greater Victoria Harbour Authority. Able to handle large vessels Ogden Point has become a major destination for cruise ships and visiting naval vessels.

To see more images of our saltwater scenes click HERE


other sizes: small medium original auto
comment
Fred Gary12-Sep-2011 18:48
Great water action. Good use of the people on the break-wall for perspective.
Bryan Murahashi23-Jan-2011 06:03
Great shot with all the whitecaps.
regi olbrechts22-Jan-2011 18:49
Impressive and beautiful tele shot Carl! The seagull comes in well!! ;-))
J. Scott Coile22-Jan-2011 18:20
Power and scale!
Carla Resh22-Jan-2011 16:16
wow great catch....cool water.V