Note: Photos by 'Gowanus' not Denton, and Gowanus says:
One is of the saw marks post removal of the 125,000 square feet of offending material.
The second is a shot of contaminated material that fell from the roof onto the unprotected public sidewalk because of the was no protection used on this project. This is one of the larger pieces and the foot is for scale but there are thousands of smaller pieces laying on the sidewalk today foot is for scale.
While I would agree that asbestos isn't always that big a deal I stand by the assertion that in this case the size location and way the project was handled is cause for some concern.
Denton says:
The original photos are in the thumbnails; I have posted another version of each with enhanced contrast.