![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Bottom Bracket lug core from below prior to fairing. Marks indicate landing pad fairing zone (1cm deep circular & flush to each stay). A mark is also indicating approximate centerline of bottom bracket.
I used a high quality G-Flex epoxy (4-7 hrs set time) thickened with a high density adhesive filler...although kit comes with 5-minute JB Kwik for this work. In hindsight I would go with a faster curing epoxy next time...as I basically lost most of a day waiting for it to set. None of these bonds (except seat post sleeve) are structural at this point...all strength comes from glass & carbon work later.
| Full EXIF Info | |
| Date/Time | 19-Jan-2013 10:38:45 |
| Make | Olympus |
| Model | E-M5 |
| Flash Used | No |
| Focal Length | |
| Exposure Time | 1/59 sec |
| Aperture | |
| ISO Equivalent | 800 |
| Exposure Bias | -0.50 |
| White Balance | |
| Metering Mode | |
| JPEG Quality | |
| Exposure Program | |
| Focus Distance | |
Copyright Tornado