West end of Griffith which is a triple track section. This freight went into the center track to let a Z-train overtake it. The snow had melted the night before, the paved exit ramp had turned into packed base rock and quickly degraded into 4 inches of water saturated mud.
D5000/55-200 Apr2011
Written permission is required to reproduce any material contained in this website.