The Wall

Here are pictures of the construction of the retaining wall just completed (Oct 2006). Construction was completed in under five weeks. Thanks to Alcon Engineering; W. M. McMurrow, Geotechnical; and particularly Johnstone McAuliffe Construction for their contributions to the success of the project.
Before - with the piers staked out
Before - with the piers staked out
Before
Before
Portable drill rig
Portable drill rig
Steel in the 18 x 15 foot hole
Steel in the 18" x 15 foot hole
Sonotube in place
Sonotube in place
Framed up and ready to pour
Framed up and ready to pour
Eleven piers in all
Eleven piers in all
Mud for the holes
Mud for the holes
The pumping process
The pumping process
Timbers arive
Timbers arive
First row of lagging
First row of lagging
Drain rock
Drain rock
Rock and tar paper in place
Rock and tar paper in place
Earth filled with netting in process
Earth filled with netting in process
Jute netting in place - done!
Jute netting in place - done!
A nice extra
A nice extra