THE DOCKS REPLACEMENT PROJECT

Pictures taken by Ralph Berglund and Phil Flagler.

Latest pictures are as of March 5, 2011. The first nine are a progress overview.

Click on any of the thumbnails below to see a larger version of that picture.

From any enlarged picture you can click on the screen's upper right hand Previous/Next to step thru the gallery.

Or, click on "slideshow" at the upper right hand corner and a slide show will proceed automatically. You can stop the slide show by clicking on pause at the bottom of the screen, and resume by clicking on play.



You can look at other galleries by clicking here. You can return to the club's home page by clicking here.

Still some boats in the basin.
Still some boats in the basin.
Monday, September 20th.  Empty.
Monday, September 20th. Empty.
October 6th.  D dock is gone.
October 6th. D dock is gone.
October 22nd.  All gone.
October 22nd. All gone.
An empty basin.
An empty basin.
October 29th The first floating dock well underway.
October 29th The first floating dock well underway.
November 7th C Dock underway.
November 7th C Dock underway.
November 16th D Dock underway.
November 16th D Dock underway.
March 5th.  Mostly done. Need some utilities.
March 5th. Mostly done. Need some utilities.
1.  Before removal.
1. Before removal.
2.  Before removal.
2. Before removal.
3.  Before removal.
3. Before removal.
4.  Before removal.
4. Before removal.
5.  September 20th.
5. September 20th.
6.  September 20th.
6. September 20th.
9.  September 20th.
9. September 20th.
7.  September 20th.
7. September 20th.
8.  Disconnecting the electrical.
8. Disconnecting the electrical.
9.  The clamshell arrives.
9. The clamshell arrives.
10.  The new docks installer moves in.
10. The new docks installer moves in.
11.  The first finger piers are knocked down.
11. The first finger piers are knocked down.
12  Then debris removal.
12 Then debris removal.
13.  Pulling out a piling.
13. Pulling out a piling.
14.  Positioning it to lie on the barge.
14. Positioning it to lie on the barge.
15.  Laying it down.
15. Laying it down.
16.  Go for another.
16. Go for another.
17.  Got it out.
17. Got it out.
18.  September 28th.  D dock gettin' smaller.
18. September 28th. D dock gettin' smaller.
19.  Staging the creosoted pilings.
19. Staging the creosoted pilings.
20.  The view from what's left of D dock.
20. The view from what's left of D dock.
21.  Slip #12, you say? And there was a boat in it?
21. Slip #12, you say? And there was a boat in it?
22.  October 5th.  Cutting the cross tie.
22. October 5th. Cutting the cross tie.
23.  Pulling one loose.
23. Pulling one loose.
24.  Pulling it out.  Note the chop.
24. Pulling it out. Note the chop.
25.  Less and less of D dock.
25. Less and less of D dock.
26. October 6th - The end of D dock.
26. October 6th - The "end" of D dock.
27. October 7th - Starting on C dock
27. October 7th - Starting on C dock
28.  There goes the first piece.
28. There goes the first piece.
29.  Cutting for the next piece.
29. Cutting for the next piece.
30. 10/22  Don't walk out on this dock..
30. 10/22 Don't walk out on this dock..
31. 10/22  The remains of C dock.
31. 10/22 The remains of C dock.
32.  Chewing B dock away.
32. Chewing B dock away.
33.  B Dock has a hole in it.
33. B Dock has a hole in it.
34.  Lifting out a piece of A Dock.
34. Lifting out a piece of A Dock.
35. 10/22  An empty basin.
35. 10/22 An empty basin.
36.  Some of the floating docks arrive.
36. Some of the floating docks arrive.
37.  Lowering in a piece of B Dock.
37. Lowering in a piece of B Dock.
38.  B Dock reaches for the bay.
38. B Dock reaches for the bay.
39.  Assembling the first (B) floating dock.
39. Assembling the first (B) floating dock.
40.  The first dock (B) as seen from the bulkhead.
40. The first dock (B) as seen from the bulkhead.
41.  Still pretty much of an empty basin.
41. Still pretty much of an empty basin.
42.  The new pilings stacked up for installation.
42. The new pilings stacked up for installation.
43.  Working under a cloudy sky and blustery winds.
43. Working under a cloudy sky and blustery winds.
44.  Waiting for the new slips.
44. Waiting for the new slips.
45.  C Dock under assembly.
45. C Dock under assembly.
46.  C Dock.
46. C Dock.
47.  The first boat in the new slips.
47. The first boat in the new slips.
48.  C Dock.
48. C Dock.
49.  D Dock underway.
49. D Dock underway.
50  D Dock
50 D Dock
51  A D Dock finger pier.
51 A D Dock finger pier.
52.  Will there be enough money left to buy the missing boards?
52. Will there be enough money left to buy the missing boards?
53.  March 5th
53. March 5th
54.  March 5th
54. March 5th
55.  March 5th
55. March 5th