photo sharing and upload picture albums photo forums search pictures popular photos photography help login
bartenderdave | profile | all galleries >> Surf Scoter: A Cuddy Cabin Bartender >> 20-4 Bartender Part II >> Battery Box Details tree view | thumbnails | slideshow

Battery Box Details

Details of battery box installation.
Carcase of 6 mm okume, edges glassed; three coats of resin over it all.
Carcase of 6 mm okume, edges glassed; three coats of resin over it all.
Skeletal test fit of components; port side of box on the left.
Skeletal test fit of components; port side of box on the left.
Test fit of chafe-protected power cables to box; vent fitting at near right hand corner.
Test fit of chafe-protected power cables to box; vent fitting at near right hand corner.
Battery hooked up; required covers on terminals to come later.
Battery hooked up; required covers on terminals to come later.
Installed, looking to port; vent and hose upper left.
Installed, looking to port; vent and hose upper left.
Vent hose route across top of port fuel tank.
Vent hose route across top of port fuel tank.
Installed; power cables and vent hose ready for the 4200 to seal it all up.
Installed; power cables and vent hose ready for the 4200 to seal it all up.
Looking aft; in use, some water leaks through floorboards into the box.
Looking aft; in use, some water leaks through floorboards into the box.