The ceiling lining for the front half of the building is complete when this photo was taken, but the lighting wiring which went in to this part of the roof on Saturday the ninth of October was not yet in. The fibreglass batts from these yellow bags were packed between the roof battens as soon as the ceiling wiring was finished. In the foreground left and along the far wall are stacked the eaves trays for the DownHill side. Photo by Kevin Mathisen.