photo sharing and upload picture albums photo forums search pictures popular photos photography help login
Andrew McGrail | profile | all galleries >> Renovation MADNESS >> Renovation activity during April 2003 tree view | thumbnails | slideshow

Renovation activity during April 2003

previous pagepages 1 2 3 4 5 6 7 8 9 10 ALL next page
almost looks like a building site
almost looks like a building site
tarp covering the roof
tarp covering the roof
view from above
view from above
preparing for 1st floor joists
preparing for 1st floor joists
Apricot, elm and plum still have leaves
Apricot, elm and plum still have leaves
roof trusses appear here
roof trusses appear here
and here
and here
floor joist beams for 1st floor are in
floor joist beams for 1st floor are in
Boss Jeff surveys the work in progress
Boss Jeff surveys the work in progress
view of elm
view of elm
looking through the floor
looking through the floor
coils of nails ready to attach flooring
coils of nails ready to attach flooring
and we're away
and we're away
slow removal of old kitchen
slow removal of old kitchen
flooring complete
flooring complete
a sense of having a roof over the living room
a sense of having a roof over the living room
across the new living room
across the new living room
more building site
more building site
the pile of timber is andrew's mess
the pile of timber is andrew's mess
pre-fab upstairs arrives
pre-fab upstairs arrives
preparing for upstairs framing
preparing for upstairs framing
and it's up in a day
and it's up in a day
191-9109_IMG.JPG
191-9109_IMG.JPG
sunset over new floor
sunset over new floor
across the roofspace
across the roofspace
towards the hills
towards the "hills"
sunset panorama
sunset panorama
new roof wrapping
new roof wrapping
recycled bricks from demolished walls
recycled bricks from demolished walls
upstairs from the backyard
upstairs from the backyard
from the front
from the front
more roof trusses go up
more roof trusses go up
bezerk timber
bezerk timber
where the stairs will be
where the stairs will be
the shape of things to come
the shape of things to come
from the front
from the front
exposed eaves detail
exposed eaves detail
bracing
bracing
roofer's scaffold
roofer's scaffold
exposed
exposed
more deliveries
more deliveries
scaffold detail
scaffold detail
between the trusses - north
between the trusses - north
between the trusses - south
between the trusses - south
external doors and windows arrive
external doors and windows arrive
the rain we had to have
the rain we had to have
mmmmmm clay
mmmmmm clay
east side of house
east side of house
new bedroom 2 from gallery
new bedroom 2 from gallery
green suburb
green suburb
patterns in the trusses
patterns in the trusses
roofing battons
roofing battons
another fine day
another fine day
three peaks visible now
three peaks visible now
looking north
looking north
more scaffolding arrives
more scaffolding arrives
safety rails
safety rails
fist floor tiles, stationary and handbags; going down
fist floor tiles, stationary and handbags; going down
installation of windows and doors
installation of windows and doors
south side of house taking shape
south side of house taking shape
making sure it wil fit
making sure it wil fit
carry them tiles
carry them tiles
it's quite high up there
it's quite high up there
plumbing installed
plumbing installed
more tiling and more dark clouds
more tiling and more dark clouds
half a new roof, plus windows
half a new roof, plus windows
clear night
clear night
roof tiles done
roof tiles done
from the street
from the street
from down the street
from down the street
insulation going on
insulation going on
old kitchen space
old kitchen space
heating ducts between floors
heating ducts between floors
across the gallery to stairwell
across the gallery to stairwell
framing to support cooling duct to ground floor
framing to support cooling duct to ground floor
a new cubby hole
a new cubby hole
life as we knew it
life as we knew it
damn builders keep throwing good stuff in the skip - must rescue
damn builders keep throwing good stuff in the skip - must rescue
moved the hoya from near the front door
moved the hoya from near the front door
up comes the hall tiles
up comes the hall tiles
roof now extends past the chimney
roof now extends past the chimney
wrapping the present
wrapping the present
pre-painting the eave linings
pre-painting the eave linings
all water tight
all water tight
our living room
our living room
ready for bricks
ready for bricks
demolishing the fireplace
demolishing the fireplace
garage is full...
garage is full...
....of stuff
....of stuff
vehicles taking over the driveway
vehicles taking over the driveway
wiring goes in
wiring goes in
repairing a sagging corner of the old roof
repairing a sagging corner of the old roof
the fireplace
the fireplace
new kitchen space
new kitchen space
from kitchen into lounge
from kitchen into lounge
new flooring timber
new flooring timber
plaster going up - 2nd bedroom
plaster going up - 2nd bedroom
feature window has magnificent view of elm
feature window has magnificent view of elm
the guttering works
the guttering works
services between floors
services between floors
making mortar
making mortar
bricks ready to go up
bricks ready to go up
temporary builder's stairs
temporary builder's stairs
across to stairwell
across to stairwell
master bedroom and cubby doorway
master bedroom and cubby doorway
second hand bricks arrive
second hand bricks arrive
bricks start to climb the walls
bricks start to climb the walls
cooktop wall framing
cooktop wall framing
a few more courses
a few more courses
Jeff snr, master of the work site
Jeff snr, master of the work site
gallery awaiting cornice
gallery awaiting cornice
previous pagepages 1 2 3 4 5 6 7 8 9 10 ALL next page