< my HO scale models >
|
< FREMO USA HO-scale modules >
|
< construction of a HO-scale replica of the Santa Fe Railroad depot at Mountainair, New Mexico >
|
level 1 (top) - to be scenicked |
level 2 - to be scenicked |
level 3 - to be scenicked |
level 4 - staging only/no scenery |
bridge segment of old layout |
boxes full with rolling stock |
the old set up in the new basement; soon to be changed drastically |
first steps |
Systems Operations Center |
Mountainair is up! |
stretching for Mountainair, NM |
Paul setting up future Mountainair |
happy switching on the old layout segments |
laying trackbed for Mountainair |
trackbed progress towards East Mountainair |
smoothing the backdrop behind Mountainair |
Which signal bridge? |
East of Mountainair (behind it, really!) |
checking out the new system |
checking the roadbed |
Amtrak on the 2% grade |
Amtrak uphill |
test train on new trackage |
Mountainair and Broncho connected! |
ATSF3751 made it to Broncho |
test train at Abo - steam rounding Willard curve |
seasoned operator |
top: Abo station; below: Willard curve into Willard |
first full (18ft) eastbound train arriving at Willard |
top: Abo; below: Willard |
eastbound ready to go down from Mountainair |
Scholle (top) and Carnero |
locos on the turnout at Scholle |
eastbound light engines at Abo; Scholle in the background |
upgrade at Abo (left) and down east of Mountainair |
power boards |
detectors and section control |
more wiring |
the C-YCCH rounds Willard curve |
dispatcher screen at the SOC |
looking east at Willard towards temporary staging |
Willard house track looking west on level 2 |
starting with Abo Canyon (left and back) |
a Pelle Soeborg model |
progress in Abo Canyon |
Abo Canyon (left) - Abo and Willard (right) |
roadbed for bridge #4 is in place; due to concrete walls it's curved backwards |
first train snaking down the canyon |
windows will receive lift-out backdrops |
intermodal train crossing the site of a future bridge #1 |
laying out the base for the helix |
working on Sais |
cutting roadbed for Sais |
first train rounding the curve at Sais |
top helix - now operational; 2%-grade, 32" minimum radius |
Becker with test train - future site of signals and the old water tower |
Sais above future Melrose |
Bailey and East Vaughn now on the lower deck |
Vaughn below Abo Canyon |
Vaughn flyover laid out on the lower deck |
testing the Faller car system, to be used for U.S.60 later |
work in progress at Vaughn (lower level) |
Golden Spike set Jan.1st, 2010 |
eastbound intermodal train flying over the SP at Vaughn |
Vaughn yard lead - stub at right is the SP connector |
meet at Scholle |
labeling |
westbound manifest |
eastbound stack on bridge #1 and 2 |
checking the rails |
Mr. Dispatcher |
bridge #1 mock-up |
bridge #1 and chaos |
guest operators Elza and Michael Gross |
Michael inspecting the stack train |
airbrushing the backdrop at Scholle |
white base level sprayed |
on to the blue |
adding blue skies |
finished blue skies over Scholle and upper canyon |
a painted backdrop makes a HUGE difference! |
991-train taking the siding at Scholle |
three levels |
Belen - where the Harvey House will be |
Belen Jct. on the lower level |
Albuquerque reverse loop is in |
wye for test and DCC-calibration |
the loop area |
Golden Spike ceremony |
main area of progress |
now added continuous running |
side view - three laps to go |
Belen yard on third level |