photo sharing and upload picture albums photo forums search pictures popular photos photography help login
atsf643 | profile | all galleries >> Galleries >> Chicago, Santa Fe & Pacific Railroad V.4 tree view | thumbnails | slideshow

Chicago, Santa Fe & Pacific Railroad V.4

Follow the design and progress on my new model layout based on the ATSF Clovis Subdivision. A track plan and description can be found in the Q2 2008 Warbonnet, the quarterly publication of the Santa Fe Historical and Modeling Society (see www.atsfrr.net).

Update (Jan.1st, 2010): as of today, continuous running is now possible on the top two levels using a temporary connection between Melrose and Becker locations. We're using Roco Line code 83 sectional track (from the old layout) until replacing it with Atlas flex track in all visible areas.

Update (Nov.2015): lower reverse loop (Albuquerque) is in and ready to use
my HO scale models
< my HO scale models >
FREMO USA HO-scale modules
< FREMO USA HO-scale modules >
construction of  a HO-scale replica of the Santa Fe Railroad depot at Mountainair, New Mexico
< construction of a HO-scale replica of the Santa Fe Railroad depot at Mountainair, New Mexico >
level 1 (top) - to be scenicked
level 1 (top) - to be scenicked
level 2 - to be scenicked
level 2 - to be scenicked
level 3 - to be scenicked
level 3 - to be scenicked
level 4 - staging only/no scenery
level 4 - staging only/no scenery
bridge segment of old layout
bridge segment of old layout
boxes full with rolling stock
boxes full with rolling stock
the old set up in the new basement; soon to be changed drastically
the old set up in the new basement; soon to be changed drastically
first steps
first steps
Systems Operations Center
Systems Operations Center
Mountainair is up!
Mountainair is up!
stretching for Mountainair, NM
stretching for Mountainair, NM
Paul setting up future Mountainair
Paul setting up future Mountainair
happy switching on the old layout segments
happy switching on the old layout segments
laying trackbed for Mountainair
laying trackbed for Mountainair
trackbed progress towards East Mountainair
trackbed progress towards East Mountainair
smoothing the backdrop behind Mountainair
smoothing the backdrop behind Mountainair
Which signal bridge?
Which signal bridge?
East of Mountainair (behind it, really!)
East of Mountainair (behind it, really!)
checking out the new system
checking out the new system
checking the roadbed
checking the roadbed
Amtrak on the 2% grade
Amtrak on the 2% grade
Amtrak uphill
Amtrak uphill
test train on new trackage
test train on new trackage
Mountainair and Broncho connected!
Mountainair and Broncho connected!
ATSF3751 made it to Broncho
ATSF3751 made it to Broncho
test train at Abo - steam rounding Willard curve
test train at Abo - steam rounding Willard curve
seasoned operator
seasoned operator
top: Abo station; below: Willard curve into Willard
top: Abo station; below: Willard curve into Willard
first full (18ft) eastbound train arriving at Willard
first full (18ft) eastbound train arriving at Willard
top: Abo; below: Willard
top: Abo; below: Willard
eastbound ready to go down from Mountainair
eastbound ready to go down from Mountainair
Scholle (top) and Carnero
Scholle (top) and Carnero
locos on the turnout at Scholle
locos on the turnout at Scholle
eastbound light engines at Abo; Scholle in the background
eastbound light engines at Abo; Scholle in the background
upgrade at Abo (left) and down east of Mountainair
upgrade at Abo (left) and down east of Mountainair
power boards
power boards
detectors and section control
detectors and section control
more wiring
more wiring
the C-YCCH rounds Willard curve
the C-YCCH rounds Willard curve
dispatcher screen at the SOC
dispatcher screen at the SOC
looking east at Willard towards temporary staging
looking east at Willard towards temporary staging
Willard house track looking west on level 2
Willard house track looking west on level 2
starting with Abo Canyon (left and back)
starting with Abo Canyon (left and back)
a Pelle Soeborg model
a Pelle Soeborg model
progress in Abo Canyon
progress in Abo Canyon
Abo Canyon (left) - Abo and Willard (right)
Abo Canyon (left) - Abo and Willard (right)
roadbed for bridge #4 is in place; due to concrete walls it's curved backwards
roadbed for bridge #4 is in place; due to concrete walls it's curved backwards
first train snaking down the canyon
first train snaking down the canyon
windows will receive lift-out backdrops
windows will receive lift-out backdrops
intermodal train crossing the site of a future bridge #1
intermodal train crossing the site of a future bridge #1
laying out the base for the helix
laying out the base for the helix
working on Sais
working on Sais
cutting roadbed for Sais
cutting roadbed for Sais
first train rounding the curve at Sais
first train rounding the curve at Sais
top helix - now operational; 2%-grade, 32 minimum radius
top helix - now operational; 2%-grade, 32" minimum radius
Becker with test train - future site of signals and the old water tower
Becker with test train - future site of signals and the old water tower
Sais above future Melrose
Sais above future Melrose
Bailey and East Vaughn now on the lower deck
Bailey and East Vaughn now on the lower deck
Vaughn below Abo Canyon
Vaughn below Abo Canyon
Vaughn flyover laid out on the lower deck
Vaughn flyover laid out on the lower deck
testing the Faller car system, to be used for U.S.60 later
testing the Faller car system, to be used for U.S.60 later
work in progress at Vaughn (lower level)
work in progress at Vaughn (lower level)
Golden Spike set Jan.1st, 2010
Golden Spike set Jan.1st, 2010
eastbound intermodal train flying over the SP at Vaughn
eastbound intermodal train flying over the SP at Vaughn
Vaughn yard lead - stub at right is the SP connector
Vaughn yard lead - stub at right is the SP connector
meet at Scholle
meet at Scholle
labeling
labeling
westbound manifest
westbound manifest
eastbound stack on bridge #1 and 2
eastbound stack on bridge #1 and 2
checking the rails
checking the rails
Mr. Dispatcher
Mr. Dispatcher
bridge #1 mock-up
bridge #1 mock-up
bridge #1 and chaos
bridge #1 and chaos
guest operators Elza and Michael Gross
guest operators Elza and Michael Gross
Michael inspecting the stack train
Michael inspecting the stack train
airbrushing the backdrop at Scholle
airbrushing the backdrop at Scholle
white base level sprayed
white base level sprayed
on to the blue
on to the blue
adding blue skies
adding blue skies
finished blue skies over Scholle and upper canyon
finished blue skies over Scholle and upper canyon
a painted backdrop makes a HUGE difference!
a painted backdrop makes a HUGE difference!
991-train taking the siding at Scholle
991-train taking the siding at Scholle
three levels
three levels
Belen - where the Harvey House will be
Belen - where the Harvey House will be
Belen Jct. on the lower level
Belen Jct. on the lower level
Albuquerque reverse loop is in
Albuquerque reverse loop is in
wye for test and DCC-calibration
wye for test and DCC-calibration
the loop area
the loop area
Golden Spike ceremony
Golden Spike ceremony
main area of progress
main area of progress
now added continuous running
now added continuous running
side view - three laps to go
side view - three laps to go
Belen yard on third level
Belen yard on third level