 Team assembled at the DOC office, prior to departure (11/24/2012) |
 Ship's log (11/26/2012) |
 Loading Evohe, port of Bluff, South Island, NZ (11/26/2012) |
 K3EL/MM, Stewart Island (11/26/2012) |
 Heading south in rough seas (11/29/2012) |
 Assembling a Spiderbeam (11/30/2012) |
 10 m Moxon and 160 m Spiderpole inverted-L (12/3/2012) |
 Optibeam 17/12 m Yagi, near Met building, Campbell Island (12/3/2012) |
 40 m vertical, Steppir vertical, 160 m Spiderpole inv-L and 10 m Moxon, Beeman base, Campbell Island (12/3/2012) |
 Beeman base, Campbell Island (12/6/2012) |
 Generator and fuel sheds, ZL9HR (12/3/2012) |
 Les, W2LK, operating RTTY and Glenn, KE4KY operating SSB at ZL9HR (12/6/2012) |
 John, 9M6XRO operating CW, ZL9HR (12/6/2012) |
 Optibeam and Spiderbeam, looking towards US (12/5/2012) |
 Hooker's Sea Lion (12/7/2012) |
 Beeman base, Campbell Island (12/6/2012) |
 Evohe at anchor, Perseverance Harbour, Campbell Island (12/7/2012) |
 Beaming NA and SA (12/7/2012) |
 On the wharf, Campbell Island (12/8/2012) |