 Baby here is where our future home is going to be |
 The piece of land, Oct 11 2013 |
 Materials arrive to the site, June 28 |
 North side, July 29 |
 Entry to basement/Craig's room, July 2 |
 North side wall, July 3 |
 Foundation walls with basement in the back, July 3 |
 Future garden area, July 3 |
 South wall, July 3 |
 First floor roof from the street, July 9 |
 First floor with garden area, July 9 |
 Moving concrete beams, July 25 |
 Shed to store supplies, July 29 |
 First floor roof from master bedroom, July 29 |
 Floor of master bathroom, July 29 |
 Floor of master bedroom, July 29 |
 Terrace off master bedroom, August |
 Evening view from bedroom terrace, August |
 Master bedroom, August |
 Master bath and entry to bedroom, August |
 Liliana on roof top patio, August |
 Entertainment area on roof top patio, August |
 Craig's room, August |
 Kitchen area open for thought, August |
 Entry slab with garage behind, August |
 Entry and guest bathroom, August |
 Garage floor with entry to the right, August |
 Perspective SW Corner, August |
 Thank you Mr. Electrician, August |
 Front entry from above, August |
 Mesquite for Bar/Table |
 Bathroom-Entry-Garage |
 From Street Garage and Main Entry |
 Concrete Beams used in Roof-Floor |
 Concrete Beams in Place |
 Main Patio and Garage Roof |
 Roof over Garage and Entry |
 My Future Garden from Living Room |
 My Future Garden |
 My Future Garden 2 |
 Front Entry |
 Patio off Master Bedroom |
 Roof Above Master Bedroom Charco View |
 Roof Above Master Bedroom West View |
 Roof Above Master Bedroom 3 |
 Roof Above Master Bedroom 4 |
 BBQ Area with Master Bedroom Behind |
 2 X 2 piece of marble |
 Extrema II Black, For the Bathroom Walls, |
 Osaka Light Gray, Floors For All the House |
 Ceramic Floors in the Basement and Garage |
:: almost_there_ ::
|
:: Paints, sealers, etc.... ::
|
 House Street View |